AI- 51226
Commissioners Court
Meeting Date: 11/08/2021  
Bridgewater Phase 8 Final Plat
Submitted For: Clarence Daugherty Submitted By: Mike Sullivan
Department: Engineering  
Request Type: CONSENT Agenda Area: Miscellaneous

Information
Department Action
Lennar Homes, owner and developer of the Bridgewater Subdivision (Collin County Municipal District #2), request Commissioners Court consider conditional approval of the attached Final Plat of Bridgewater Phase 8.
 
The Preliminary Plat for this development was approved on May 21, 2018 (CO# 2018-409-05-21). It was previously named Country Lakes during Preliminary Plat. This development is a Municipal Utility District (MUD) and all the infrastructure will be owned and maintained by the district.
Phase 8 is 50.02 acres consisting of 228 residential lots and 6 HOA lots. The lots do not front on the existing public roads, therefore road construction will be required.
 
At Preliminary Plat, the owner submitted a drainage study for the entire tract. The project generally drains from north to south and will outfall to an existing FEMA floodplain associated with the East Fork Trinity River tributary A before ultimately draining into Lake Lavon. To ensure no rise in floodplain elevations downstream of the project, four inline detention ponds are proposed to reduce post-development peak flows to pre-development rates.
 
Water will be supplied to the development by Culleoka Water Supply Company and sanitary sewer will be provided by the City of Princeton. Storm Drains and Sanitary Sewer Plans will meet the standards for the City of Princeton and the roads will meet the County minimum standards as well as the standards for the City of Princeton.
 
The plat generally meets the County’s SUBDIVISION RULES as outlined in Section 1.05 of the Collin County Subdivision Regulations and authorized under Local Government Code (LGC) 232, however the developer will be required to re-submit the plat with the necessary edits.  
These items will be outlined in a detailed punch list to the developer within 10 days following Court’s conditional approval and will cite the reference in the County’s Subdivision Regulations and LGC.
ACTION
We request Commissioners Court consideration for the approval of the Final Plat for Bridgewater phase 8 with the condition that the developer make the necessary technical edits, based on LGC 232.001 and 232.003.
 
Purchasing Department Action
No action by Purchasing.
HR and/or IT Action
Budget Department Action
No action by Budget.
Auditor's Office Action
No action by Auditor.
Commissioners Court
Final plat of Bridgewater Phase 8, Engineering. 

Budget Information
Information about available funds
Budgeted: Funds Available: Adjustment: Amount Available:
Unbudgeted: Funds NOT Available: Amendment:
Account Code(s) for Available Funds
1:
Fund Transfers
Remarks:
Attachments
Court Order 2021-1149-11-08
memo
map
Plat