Print Back to Calendar Return
AI- 48191
Commissioners Court
Meeting Date: 04/06/2020  
Bridgewater Phase 4b Final Plat
Submitted For: Clarence Daugherty Submitted By: Mike Sullivan
Department: Engineering  
Request Type: CONSENT Agenda Area: Miscellaneous

Information
Department Action
 Lennar Homes, owner and developer of the Collin County Municipal Utility District (MUD) #2, aka Bridgewater Subdivision, requests Commissioners Court consideration of the attached Final Plat. The Preliminary Plat (approved under the former name Country Lakes) was approved on May 21, 2018 (CO# 2018-409-05-21)
 
LOCATION AND SIZE
The MUD encompasses 515.50 acres and is located on the southeast corner of FM 546 and CR 437 and outside of any municipality’s Extra Territorial Jurisdiction. See location map attached. 
Phase 4b is 33.026 acres consisting of 166 residential lots and 4 common area (HOA) lots.
Typical residential lot sizes range from 4600 sq. ft. to just under 17,000 sq. ft. All the lots do not front on the existing public roads, therefore road construction will be required.
ROADS, UTILITIES AND DRAINAGE
Roadway plan profiles have been submitted and will meet the County minimum standards as well as the standards for the City of Princeton, Texas.
Storm and Sanitary Sewer Plans have been submitted and will meet the standards for the City of Princeton, Texas.
At Preliminary Plat, the owner submitted a drainage study for the entire tract. The project generally drains from north to south and will outfall to an existing FEMA floodplain associated with the East Fork trinity River tributary A before ultimately outfalling into Lake Lavon. To ensure no rise in floodplain elevations downstream of the project, four inline detention ponds are proposed to reduce post-development peak flows to pre-development rates. A Letter of Map Revision (LOMR) will be submitted to the county for review and then submitted to FEMA once construction within the floodplain is complete. This does not occur with phase 4b. Phase 4b will drain into a detention pond already constructed.
The water utility plans meet the requirements for International Fire Code. Once improvements have been made, water will be supplied to the development by Culleoka Water Supply Company and sanitary sewer will be provided by the City of Princeton.
Once approved, construction of the infrastructure can begin.
ACTION
We recommend Commissioners Court approve the Final Plat for Bridgewater Phase 4b.
 
Purchasing Department Action
No action by Purchasing.
HR and/or IT Action
Budget Department Action
No action by Budget.
Auditor's Office Action
No action by Auditor.
Commissioners Court
Final plat for Bridgewater Phase 4b, Engineering. 

Budget Information
Information about available funds
Budgeted: Funds Available: Adjustment: Amount Available:
Unbudgeted: Funds NOT Available: Amendment:
Account Code(s) for Available Funds
1:
Fund Transfers
Remarks:
Attachments
Court Order
memo
map
plat

AgendaQuick©2005 - 2024 Destiny Software Inc., All Rights Reserved